ClutchCalcs

Construction

Drain Cleanout Spacing Calculator

Code requires cleanouts at specific intervals so plumbers can snake any clog. Lay them out right the first time.

Cleanouts required

Max spacing
At every
Plus stack base + outside

FAQ

Spacing for 6" or larger? +
Often increased to 150 ft for 6"+ pipes (IPC 708.3.5). Verify with your AHJ.
Two-way cleanouts? +
Required at the building exterior so plumbers can access both directions without entering the building.