Panel Load Fill Calculator
Add up existing breakers and see how much room you have for new circuits before service upgrade.
Available headroom
—
- Demand load
- —
- % of main
- —
- New circuits OK?
- —
FAQ
Sum of breakers > main, is that OK? +
Yes! Diversification factor — not all circuits run at full load simultaneously. Code does not limit breaker sum, only the calculated load.
When to upgrade service? +
When calculated load (NEC 220) exceeds main rating, or when you keep tripping the main. Modern reality: EV + heat pump usually needs 200A+.