Construction
SEER / EER Conversion Calculator
SEER, SEER2, EER, kW/ton — different units all describing AC efficiency. Convert and estimate annual operating cost.
Annual cost
—
- EER (est)
- —
- kWh/year
- —
- kW/ton
- —
FAQ
SEER vs SEER2? +
SEER2 (2023+) uses higher static pressure testing — typically 5% lower than old SEER for the same unit. Same physical efficiency.
Worth upgrading SEER 13 to 18? +
In hot climates (1500+ cooling hours), yes — payback in 5-7 years. In mild climates, take longer than equipment life.
Heads up: ClutchCalcs gives you fast, accurate results — but always sanity-check critical decisions (medical, financial, structural) with a professional.
Spot a wrong number or want a calculator added? Tell us →