ClutchCalcs

Construction

Septic Drain Field Calculator

Drain field sizing is dirt math. Faster perc rates mean less trench; slow clay can need 5x the area.

Trench length (ft)

GPD
Loading rate
Area (sq ft)

FAQ

What is perc? +
Percolation rate — how many minutes for water to drop 1 inch in a saturated test hole. Slow perc means slow drain field.
Engineered system needed? +
If perc is over 60 min/in or there is shallow bedrock/water table, you usually need a mound, aerobic treatment unit, or pressure dose system.